Home Products UAE Markets About Blog Get Quote →

OEM & Private Label Coffee Machines for UAE — Launch Your Own Brand

Launching a coffee machine brand in the UAE has never been more accessible. Maquinox offers complete OEM (Original Equipment Manufacturer) and private label services for UAE companies wanting to sell coffee machines under their own brand identity. Whether you're a UAE retail chain building an own-brand electronics range, a hospitality group wanting branded in-room coffee machines, or an online seller wanting a differentiated product — our OEM service provides the full package from factory floor to branded UAE retail shelf.

What Our UAE OEM Service Includes

Machine Branding

Custom logo on machine body via laser engraving or branded panel insert. Custom machine color options (subject to MOQ). Brand name on carafe, drip tray, and control panel. Physical sample with your branding before production sign-off.

Packaging & Documentation

Branded outer packaging in English and Arabic — full-color box design. Arabic product manual and warranty card. Custom packaging inserts and branded welcome cards. Certificate of conformity issued in your brand name.

Regulatory Compliance

CE and RoHS certification included. Documentation formatted for UAE retail product registration. HS code documentation and country of origin certificates for UAE customs. ESMA-compliant product labeling templates.

Quality & Sampling

Physical sample with your branding shipped before bulk production. Factory quality inspection at production completion. Full QC report and product specification sheet in your brand name. Pre-shipment inspection available on request.

OEM Pricing & Minimum Order Quantities

Machine TypeOEM MOQLead TimeBase FOB Price
Espresso Machines100 units45–60 daysfrom $95/unit
Bean-to-Cup Machines100 units45–60 daysfrom $55/unit
Capsule Machines200 units45–60 daysfrom $50/unit
Commercial Espresso50 units50–65 daysfrom $310/unit
Office Machines100 units45–60 daysfrom $20/unit
Drip Filter Machines200 units40–55 daysfrom $32/unit

OEM Process — Step by Step

01

Send Your Requirements

Share your branding assets (logo, colors, brand guidelines), required machine type, quantity, and target UAE retail price. We provide a detailed OEM quotation within 48 hours.

02

Receive Branded Sample

We produce a physical sample with your logo, colors, and packaging. Sample shipped to UAE for your approval. Typical sample production time: 7–14 days. Amendments incorporated at this stage.

03

Approve & Confirm Production

Sign off on the approved sample, confirm purchase order and production timeline. Production starts immediately upon deposit. QC inspection at factory during production.

04

Production + Shipping

30–45 days production followed by sea freight to Jebel Ali (18–22 days) or air freight to DXB (3–5 days). Full CE documentation and customs paperwork in your brand name delivered with shipment.

Frequently Asked Questions — OEM Coffee Machines UAE

What is the minimum OEM order quantity for UAE? +

OEM MOQ: 100 units for espresso, bean-to-cup, and office machines; 200 units for capsule machines; 50 units for commercial espresso. Mixed OEM orders across machine types available.

How long does OEM production take for UAE orders? +

Sample approval 7–14 days, production 30–45 days after sample approval, sea freight 18–22 days. Total: approximately 55–80 days from order to UAE delivery. Rush production available.

Can I register CE certification under my own UAE brand name? +

Yes. CE certification in your brand name adds approximately 3–4 weeks and testing fees. More commonly, UAE brands use our existing CE certification with their brand marked on the machine — compliant for UAE retail.

Is Arabic packaging available for OEM orders? +

Yes. Bilingual English/Arabic packaging, user manuals, and warranty cards included as standard in UAE OEM service. We provide design templates; Arabic copy review is your responsibility.

Request an OEM Quote for UAE

Custom logo, Arabic packaging, CE certification. MOQ from 50 units. 45–60 day lead time.

Response within 24 hours · MOQ from 50 units · CE certified · Arabic packaging included